Pre-Construction Anti-Termite Treatment
Soil barriers before the slab goes down. 10-year certificate for handover files.
02 / 06 · Termite & Structural Protection
The cheapest termite protection is the one applied before construction — a continuous chemical barrier under the foundation.
We treat soil and foundation stages before slab pour and issue a 10-year certificate with documentation builders need at handover.
What's included
Pre-Construction Treatment
Chemical barrier on soil and foundation before slab pour. 10-year certificate. Mandatory in termite-prone zones.
Post-Construction Treatment
Drill-and-inject into walls, floors, and foundation. 5–8 year coverage. Minimal disruption.
Wood Preservation & Borate
Borate applied to furniture, door frames, and structural timber. Termites die on contact or after feeding.
Annual Monitoring Program
Quarterly inspections with perimeter monitoring stations. Written report every visit.
Method
Same four-step process on every job
- 01
Survey & scope
Site walk, infestation mapping, documentation of entry points. Nothing starts without a signed scope.
- 02
Method selection
IPM-first sequencing — monitor before treating. Formulations matched to the site. SDS binder prepared.
- 03
Treatment
PPE-equipped technician. Timed application window communicated in advance. Disruption kept to what the job requires.
- 04
Verification & sign-off
Post-treatment inspection. Audit-ready job sheet issued. Account manager available for follow-up.
Questions
Common questions
- At which construction stage is treatment done?
- In stages: foundation pits, backfill, and plinth — before the slab is poured. We coordinate with your site schedule.
- Is the 10-year certificate accepted by builders and banks?
- Yes. The certificate documents chemical, dosage, and treated areas, and is standard in builder handover and society files.
- Can you treat a site where construction has already started?
- Often yes, if the foundation is still accessible. Share your site stage and we'll advise — otherwise post-construction treatment applies.
- What does pre-construction treatment cost?
- Final quote depends on flat size, infestation level, and treatment choice. Share your details for an exact quote — starting prices to be confirmed by Prime.
Also relevant
Other pest-control services
- Termite Treatment in MumbaiStop silent structural damage. Barriers, wood treatment, and monitored follow-ups.
- Cockroach Control in MumbaiKitchen cockroaches gone without smell or shutdown. Gel bait where sprays can't go.
- Mosquito Control in MumbaiMore than fogging. Source elimination plus dengue-vector mapping for compounds.
- Rodent Control in MumbaiExclusion first, then trapping and baiting — mapped and documented throughout.
Book
Ready to treat this? We'll scope it free.
Free site inspection anywhere in MMR. We recommend the right protocol on the spot.

BMC-authorised operator · Free inspection · No obligation

